Opens in a new tab

Breaking news

Cyprus Unveils €2.5 Million Electric Vehicle Initiative to Accelerate Clean Transport


The Cabinet has approved a strategic €2.5 million funding initiative designed to bolster the electric and hybrid vehicle market across Cyprus. Transport Minister Alexis Vafeades detailed that the scheme is a cornerstone in the nation’s pursuit of enhanced electric mobility—a critical factor in achieving its ambitious environmental targets.

Strategic Funding for A Greener Future

This robust government-backed plan will offer grants for both new and used electric vehicles, thereby making clean transportation more accessible. By reducing financial barriers for consumers, Cyprus is taking proactive measures to accelerate the adoption of sustainable technologies and stimulate market demand for green mobility solutions.

Phased Grant Allocation and Preexisting Funds

Before launching the new scheme, the ministry will reassign 97 vehicle grants and 18 motorcycle grants from previous rounds that had either been cancelled or not linked to orders. Minister Vafeades confirmed that once these preexisting grants are utilized, the new funding will fully activate. A total of 260 new grants remain available at unchanged amounts, ensuring continuity for applicants who ordered vehicles after the previous scheme ended.

Ensuring Continuity Under The Recovery And Resilience Plan

The initiative not only reinforces Cyprus’s commitment to sustainable transport but also seamlessly integrates with the Recovery and Resilience Plan, safeguarding against wasted allocations. With approximately 100 grants from the earlier round still unclaimed, these will be reissued in priority order, ensuring every available opportunity is effectively leveraged.

Further details regarding grant categories, launch dates, and terms are expected to be published on the Road Transport Department’s website, cementing this strategic plan as a pivotal step towards a greener, more sustainable future in Cyprus.


€50 Million Luxury Resort Planned For Ayia Napa

Ayia Napa could strengthen its position in the premium tourism market with a proposed €50 million mixed-use resort combining a hotel, serviced apartments, luxury bungalows and a beach club.

Aesara Investments Ltd has submitted an information form to the Department of Environment for a development to operate under the name Atlantica Wavemaster Hospitality. The project is planned for the Limnara area of Ayia Napa, along the coast south of Kryou Nerou Avenue, between the town centre and Cape Greco.

Hotel, Apartments And Luxury Bungalows

The proposed resort will include a 324-room hotel with capacity for 648 guests, alongside a condo-hotel building containing 20 one- and two-bedroom apartments. Facilities are planned to include restaurants, bars, cafés, a spa with an indoor pool, a gym, shops, a multipurpose hall, a children’s club and a cinema.

A further 33 three-level luxury bungalows, each designed for two guests and featuring a private swimming pool, are planned for the southern part of the site. A beach club with a restaurant and an outdoor pool complex covering more than 6,300 square metres will also form part of the development.

The project includes 321 parking spaces, including 12 for people with disabilities, and 14,196 square metres of landscaped green space featuring local plant species.

Seasonal Hotel Operations And Year-Round Residences

The hotel is expected to operate from March to November, with peak occupancy during the summer season. The condo-hotel apartments, meanwhile, will be available for sale or long-term rental and intended for year-round residence. Owners and tenants will also have access to the resort’s facilities, including its pools, restaurants and fitness areas.

Construction is expected to take 24 months once the required permits are secured. At the busiest stage, the project could employ around 100 workers per day.

Environmental Restrictions Near Cape Greco

The site’s proximity to protected Natura 2000 areas has prompted strict environmental requirements. The Cape Greco Special Protection Area borders the site to the south, while a Special Area of Conservation lies approximately 50 metres away.

Conditions imposed by the Department of Environment include a maximum building height of five floors, or 18.5 metres, and restrictions on permanent structures near the coastline. The project must also use spider-web type glazing and low-intensity lighting to minimise disturbance to local birdlife.

According to the project’s consultants, the design has been prepared to comply with the environmental conditions and the final report on cumulative impacts for the Cape Greco Special Protection Area. The hotel and apartment building are positioned in the central and northern parts of the plot, away from the shoreline.

Within the designated no-build zone, located 40 metres from the boundary of the beach protection zone, only swimming pools are planned. The consultants state that these are not expected to affect protected species in the area.

eCredo
The Future Forbes Realty Global Properties
Aretilaw firm
Uol

Become a Speaker

Become a Speaker

Become a Partner

Subscribe for our weekly newsletter